Data mobility and migration

A one-off migration moves very large data volumes, together with their metadata, from one environment to another. It may support storage replacement, consolidation or relocation. File counts and application dependencies determine transfer planning and the final cutover.

I assess the source and destination environments, organise initial transfers and subsequent synchronisation, and define validation and cutover procedures. The project checks data integrity, metadata and access permissions against the capabilities of the selected platforms.

Understand your requirements

The project concerns a one-off move of files and their metadata. Initial copying, synchronisation and final cutover are planned separately, with validation before source storage is retired.

Architectures to assess

Transfer between heterogeneous storage systems

Transfer infrastructure is sized against data volumes, file counts, throughput and source and target platforms. Atempo MIRIA is the solution to assess for these large-scale migrations.

Validate and cut over

A pilot verifies which metadata and permissions can be transferred. The plan defines integrity checks, the cutover window and rollback conditions. This one-off operation is distinct from ongoing data placement throughout its lifecycle.

Explore the relevant products

One point of contact

I assess your requirements, select the appropriate configuration and support its deployment and operation. Your infrastructure and working practices guide the choice.